NE
Histórico do Empenho:
Favorecido:
Data do Empenho:
Valor do Empenho
:
Unidade Orçamentária:
Elemento de Despesa:
Nº Empenho:
Tipo de Empenho:
LIQUIDAÇÃO
PAGAMENTO
Código de verificação:
Timeout expired. The timeout period elapsed prior to obtaining a connection from the pool. This may have occurred because all pooled connections were in use and max pool size was reached.